Command Palette
Search for a command to run...
Board
Open
JOB-1127Paid
Panel Upgrade — 400A Service + Surge Protection, Sandpiper Dental Group
Sandpiper Dental Group · Parking Structure
$4,544
Panel Upgrade
Scope of work
Replace existing service panel and bring to current code. Includes as-built markup on completion.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 9 ea | $36.97 | $332.73 |
| Material100A Main Breaker Load Center, 24-space | 3 ea | $308.66 | $925.98 |
| MaterialType 2 Whole-Home Surge Protective Device | 2 ea | $260.71 | $521.42 |
| Material4/0 AWG Aluminum SER Cable | 1 ft | $8.22 | $8.22 |
| PermitPermit and inspection fees | 1 ea | $288.59 | $288.59 |
| LaborElectrical labour — panel upgrade | 20.9 hr | $118.05 | $2,467.17 |
| Total | $4,544.11 | ||
Job photos
3 from the field · click to enlarge
Activity
Notes on this job
- EVEmmett VanceDec 18
Walked the site with the customer. Scope confirmed, no surprises.
Customer
Sandpiper Dental Group
Junia Beckett
Maintenance Supervisor
9238 Stonegate Cir
Seminole, FL 34023
Seminole, FL 34023
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdDec 4, 2024
- WonDec 19, 2024
- ScheduledJan 7, 2025
- CompletedJan 16, 2025
