Permit to Power
Finished work, waiting on somebody else's calendar — plan review, inspections, and the meter.
finished, not billable — waiting on other people's calendars
longest wait
City of Tampa, avg to issue
re-inspection fees, 45 days
2 inspections failed on the same defect — Receptacle spacing — kitchen counter
$339 in re-inspection fees and 2 extra truck rolls in the last 45 days. Worth ten minutes at Monday's huddle.
The pipeline
Permit applied
8Service Upgrade — 400A Meter Main, Marsh Landing Townhomes
Panel Replacement — Federal-Style Panel Swap, Bayshore Condominium Association
Panel Upgrade — 100A Service, Sawgrass Reach Property Management
Panel Upgrade — 400A Service + Surge Protection, Bayshore Condominium Association
Service Upgrade — 400A Meter Main, Hollis Radcliffe
+3 more · $13,452
Rough scheduled
2Failed — recall
3Service Upgrade — 400A Meter Main, Danielle Fontaine
Receptacle spacing — kitchen counter
Generator Install + 400A ATS — Sable Ridge HOA
AFCI protection missing — bedroom circuits
Panel Upgrade — 100A Service, Sandpiper Senior Living
Receptacle spacing — kitchen counter
Awaiting final
2Awaiting meter
7Ground-Up Electrical — 18,000 sq ft Shell, Oakfield School District
Generator Install + 200A ATS — Clearpoint Bowling Center
EV Charger Install (23 ports) — Mangrove Bay Estates
Generator Transfer Switch — Marsh Landing Townhomes
Generator Install + 100A ATS — Kingfisher Hotel & Suites
+2 more · $21,841
Oldest blocked job
Ground-Up Electrical — 18,000 sq ft Shell, Oakfield School District — Oakfield School District
JOB-1506 · Hillsborough County
finished, not billable
Ezra drafted both of these when the job passed day 14. Nothing has been sent.
Following up on JOB-1506 at Oakfield School District. Final inspection passed and the service is ready for release; we are at day 37 awaiting meter set. Please advise the scheduled date or the outstanding item. Account and permit details attached.
Quick update — your work is complete and inspected. We're waiting on Harborlight Electric Cooperative to release power, and we've escalated this morning. We'll confirm the moment it's energized.
Who's slow
Average days to issue, last 180
Measured from your own permits. Bid the slow jurisdictions with their timeline priced in.
$243Kof completed work is sitting behind four organisations that don't work for you. Ezra watches all four and escalates on your behalf.