Command Palette
Search for a command to run...
Board
Open
JOB-1182Lost
Generator Transfer Switch — Copperfield Veterinary Clinic
Copperfield Veterinary Clinic · Building A — Loading Dock
$18,875
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Final walkthrough with customer before sign-off. Customer to provide site access during working hours.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 11 ea | $36.97 | $406.67 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 1 spool | $200.81 | $200.81 |
| PermitPermit and inspection fees | 1 ea | $460.33 | $460.33 |
| LaborElectrical labour — generator install | 150.9 hr | $118.01 | $17,806.97 |
| Total | $18,874.78 | ||
Customer
Copperfield Veterinary Clinic
Corey Thackeray
Maintenance Supervisor
781 Sawgrass Reach Dr
Tampa, FL 34302
Tampa, FL 34302
Timeline
- Lead createdMar 16, 2024
- Bid lostMar 27, 2024
Lost: Budget not approved this cycle
