Command Palette
Search for a command to run...
Board
Open
JOB-1185Lost
Panel Upgrade — 200A Service, Copperfield Veterinary Clinic
Copperfield Veterinary Clinic · Clubhouse
$4,093
Panel Upgrade
Scope of work
Replace existing service panel and bring to current code. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 6 ea | $36.97 | $221.82 |
| Material20A AFCI/GFCI Dual-Function Breaker | 3 ea | $77.40 | $232.20 |
| Material4/0 AWG Aluminum SER Cable | 133 ft | $8.22 | $1,093.26 |
| PermitPermit and inspection fees | 1 ea | $387.63 | $387.63 |
| LaborElectrical labour — panel upgrade | 18.3 hr | $117.93 | $2,158.08 |
| Total | $4,092.99 | ||
Customer
Copperfield Veterinary Clinic
Corey Thackeray
Maintenance Supervisor
9653 Brightwater Ave
Temple Terrace, FL 34004
Temple Terrace, FL 34004
Timeline
- Lead createdJan 19, 2024
- Bid lostFeb 7, 2024
Lost: Price — went with a lower bid
