Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material400A Meter Main Combo, 42-space5 ea$1,721.36$8,606.80
Material20A Single-Pole Breaker8 ea$16.25$130
Material50A Double-Pole Breaker5 ea$58.90$294.50
Material12 AWG THHN Copper, Black — 500 ft spool2 spool$200.81$401.62
Material20A Double-Pole Breaker5 ea$36.97$184.85
PermitPermit and inspection fees1 ea$218.43$218.43
LaborElectrical labour — generator install87.9 hr$118.02$10,373.74
Total$20,209.94

Activity

Notes on this job

  • EV
    Emmett VanceOct 27

    Found existing wiring in worse shape than quoted. Flagged to customer.

Customer

Open
Willow Bend Bowling Center
Sloane Whitaker
Property Manager
8451 Sawgrass Reach Dr
Seminole, FL 33918
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Oct 22, 2022
  2. Won
    Nov 23, 2022
  3. Scheduled
    Dec 17, 2022
  4. Completed
    Dec 25, 2022