3

Command Palette

Search for a command to run...

Board
JOB-1193Paid

Panel Replacement — Federal-Style Panel Swap, Copperfield Veterinary Clinic

Copperfield Veterinary Clinic · Building A — Loading Dock

$4,890
Panel Upgrade

Scope of work

Replace existing service panel and bring to current code. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material14/2 NM-B w/ Ground — 250 ft coil3 coil$128.13$384.39
Material20A Single-Pole Breaker6 ea$16.25$97.50
Material20A Double-Pole Breaker2 ea$36.97$73.94
Material10 AWG THHN Copper, Red — 500 ft spool2 spool$305.45$610.90
Material8 AWG THHN Copper — 500 ft spool1 spool$484.38$484.38
Material6 AWG Bare Copper Ground60 ft$2.92$175.20
PermitPermit and inspection fees1 ea$368.88$368.88
LaborElectrical labour — panel upgrade22.8 hr$118.18$2,694.48
Total$4,889.67

Customer

Open
Copperfield Veterinary Clinic
Corey Thackeray
Maintenance Supervisor
781 Sawgrass Reach Dr
Tampa, FL 34302
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    May 24, 2023
  2. Won
    Jun 13, 2023
  3. Scheduled
    Jul 10, 2023
  4. Completed
    Jul 10, 2023

Documents