Board
JOB-1204Paid

EV Charging Expansion Phase 2 — Heron Cove Self Storage

Heron Cove Self Storage · Pump House

$10,598
EV Charger Install

Scope of work

Install Level 2 EV charging equipment with dedicated circuit. Final walkthrough with customer before sign-off. Work to be performed outside business hours.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material200A Main Breaker Load Center, 40-space1 ea$609.04$609.04
MaterialAutomatic Transfer Switch, 200A2 ea$1,553.66$3,107.32
Material20A Single-Pole Breaker9 ea$16.25$146.25
Material6 AWG Bare Copper Ground147 ft$2.92$429.24
LaborElectrical labour — ev charger install53.4 hr$118.08$6,305.72
Total$10,597.57

Job photos

4 from the field · click to enlarge

Customer

Open
Heron Cove Self Storage
Victor Jessup
Operations Manager
6011 Silverbrook Path
Plant City, FL 34394
Assigned crew
Crew 3 — Residential

Timeline

  1. Lead created
    Aug 18, 2023
  2. Won
    Sep 5, 2023
  3. Scheduled
    Sep 22, 2023
  4. Completed
    Sep 26, 2023

Documents