Board
JOB-1221Paid

EV Charger Install — Level 2, 48A, Stonegate Distribution Center

Stonegate Distribution Center · Primary Site

$11,628
EV Charger Install

Scope of work

Install Level 2 EV charging equipment with dedicated circuit. Existing materials removed and disposed of.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A Double-Pole Breaker7 ea$36.97$258.79
Material14/2 NM-B w/ Ground — 250 ft coil1 coil$128.13$128.13
Material8 AWG THHN Copper — 500 ft spool2 spool$484.38$968.76
MaterialType 2 Whole-Home Surge Protective Device2 ea$260.71$521.42
Material4/0 AWG Aluminum SER Cable89 ft$8.22$731.58
LaborElectrical labour — ev charger install76.4 hr$118.05$9,018.88
Total$11,627.56

Activity

Notes on this job

  • AssistantFeb 13

    Follow-up scheduled — no response to the estimate after 6 days.

  • EV
    Emmett VanceFeb 2

    Found existing wiring in worse shape than quoted. Flagged to customer.

  • AssistantJan 25

    Estimate drafted from the site notes and sent for review.

Customer

Open
Stonegate Distribution Center
Emmett Jessup
Operations Manager
8698 Brightwater Ave
Plant City, FL 34391
Assigned crew
Crew 3 — Residential

Timeline

  1. Lead created
    Jan 19, 2025
  2. Won
    Feb 3, 2025
  3. Scheduled
    Feb 24, 2025
  4. Completed
    Feb 27, 2025