JOB-1221Paid
EV Charger Install — Level 2, 48A, Stonegate Distribution Center
Stonegate Distribution Center · Primary Site
$11,628
EV Charger Install
Scope of work
Install Level 2 EV charging equipment with dedicated circuit. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 7 ea | $36.97 | $258.79 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 1 coil | $128.13 | $128.13 |
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| MaterialType 2 Whole-Home Surge Protective Device | 2 ea | $260.71 | $521.42 |
| Material4/0 AWG Aluminum SER Cable | 89 ft | $8.22 | $731.58 |
| LaborElectrical labour — ev charger install | 76.4 hr | $118.05 | $9,018.88 |
| Total | $11,627.56 | ||
Activity
Notes on this job
- AssistantFeb 13
Follow-up scheduled — no response to the estimate after 6 days.
- EVEmmett VanceFeb 2
Found existing wiring in worse shape than quoted. Flagged to customer.
- AssistantJan 25
Estimate drafted from the site notes and sent for review.
Customer
Stonegate Distribution Center
Emmett Jessup
Operations Manager
8698 Brightwater Ave
Plant City, FL 34391
Plant City, FL 34391
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdJan 19, 2025
- WonFeb 3, 2025
- ScheduledFeb 24, 2025
- CompletedFeb 27, 2025