JOB-1238Paid

Generator Transfer Switch — Silverbrook Car Wash

Silverbrook Car Wash · Building A — Front Office

$19,468
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. Existing materials removed and disposed of.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A Double-Pole Breaker9 ea$36.97$332.73
Material8 AWG THHN Copper — 500 ft spool3 spool$484.38$1,453.14
Material14/2 NM-B w/ Ground — 250 ft coil1 coil$128.13$128.13
Material200A Main Breaker Load Center, 40-space6 ea$609.04$3,654.24
MaterialAutomatic Transfer Switch, 200A2 ea$1,553.66$3,107.32
PermitPermit and inspection fees1 ea$392.12$392.12
LaborElectrical labour — generator install88.1 hr$118.05$10,400.44
Total$19,468.12

Customer

Open
Silverbrook Car Wash
Owen Cardoza
Project Manager
8063 Brightwater Ave
Safety Harbor, FL 34495
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Oct 10, 2025
  2. Won
    Nov 4, 2025
  3. Scheduled
    Nov 7, 2025
  4. Completed
    Nov 16, 2025