JOB-1240Paid

Ground-Up Electrical — 13,000 sq ft Shell, Silverbrook Car Wash

Silverbrook Car Wash · Building A — Front Office

$84,061
New Construction Rough-In

Scope of work

Complete electrical rough-in per approved drawings. Final walkthrough with customer before sign-off. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A GFCI Receptacle, Weather Resistant7 ea$33.87$237.09
MaterialWire Nuts, Assorted — 500 ct2 box$64.94$129.88
MaterialLevel 2 EV Charger, 48A Hardwired12 ea$862.22$10,346.64
Material3-Way Dimmer Switch, LED Compatible9 ea$43.93$395.37
Material4/0 AWG Aluminum SER Cable234 ft$8.22$1,923.48
PermitPermit and inspection fees1 ea$392.30$392.30
LaborElectrical labour — new construction rough-in598.6 hr$118$70,636.49
Total$84,061.25

Job photos

2 from the field · click to enlarge

Customer

Open
Silverbrook Car Wash
Owen Cardoza
Project Manager
8063 Brightwater Ave
Safety Harbor, FL 34495
Assigned crew
Crew 1 — Commercial

Timeline

  1. Lead created
    May 26, 2024
  2. Won
    Jun 13, 2024
  3. Scheduled
    Jun 17, 2024
  4. Completed
    Jun 21, 2024