Command Palette
Search for a command to run...
Board
Open
JOB-1240Paid
Ground-Up Electrical — 13,000 sq ft Shell, Silverbrook Car Wash
Silverbrook Car Wash · Building A — Front Office
$84,061
New Construction Rough-In
Scope of work
Complete electrical rough-in per approved drawings. Final walkthrough with customer before sign-off. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A GFCI Receptacle, Weather Resistant | 7 ea | $33.87 | $237.09 |
| MaterialWire Nuts, Assorted — 500 ct | 2 box | $64.94 | $129.88 |
| MaterialLevel 2 EV Charger, 48A Hardwired | 12 ea | $862.22 | $10,346.64 |
| Material3-Way Dimmer Switch, LED Compatible | 9 ea | $43.93 | $395.37 |
| Material4/0 AWG Aluminum SER Cable | 234 ft | $8.22 | $1,923.48 |
| PermitPermit and inspection fees | 1 ea | $392.30 | $392.30 |
| LaborElectrical labour — new construction rough-in | 598.6 hr | $118 | $70,636.49 |
| Total | $84,061.25 | ||
Job photos
2 from the field · click to enlarge
Customer
Silverbrook Car Wash
Owen Cardoza
Project Manager
8063 Brightwater Ave
Safety Harbor, FL 34495
Safety Harbor, FL 34495
Assigned crew
Crew 1 — Commercial
Timeline
- Lead createdMay 26, 2024
- WonJun 13, 2024
- ScheduledJun 17, 2024
- CompletedJun 21, 2024
