Tenant Build-Out Rough-In Phase 2 — Silverbrook Car Wash
Silverbrook Car Wash · Building B — Storage Wing
$75,661
New Construction Rough-In
Scope of work
Complete electrical rough-in per approved drawings. Permit and inspection included. Customer to provide site access during working hours.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material3-Way Dimmer Switch, LED Compatible | 2 ea | $43.93 | $87.86 |
| Material3/8 in Drop-In Anchor — 100 ct | 4 box | $73.14 | $292.56 |
| Material50A Double-Pole Breaker | 5 ea | $58.90 | $294.50 |
| Material20A AFCI/GFCI Dual-Function Breaker | 5 ea | $77.40 | $387 |
| MaterialCommercial Dual-Port EV Pedestal | 5 ea | $4,994.60 | $24,973 |
| PermitPermit and inspection fees | 1 ea | $277.16 | $277.16 |
| LaborElectrical labour — new construction rough-in | 418.2 hr | $118 | $49,348.46 |
| Total | $75,660.54 | ||
Job photos
2 from the field · click to enlarge
Activity
Notes on this job
- JAJunia AldermanAug 22
Inspection passed first time.
- EVEmmett VanceAug 21
Customer asked to push a week. Rescheduled.
- AssistantAug 7
Follow-up scheduled — no response to the estimate after 6 days.
Customer
Silverbrook Car Wash
Owen Cardoza
Project Manager
8711 Heron Cove Ct
Oldsmar, FL 34293
Oldsmar, FL 34293
Assigned crew
Crew 1 — Commercial
Timeline
- Lead createdJul 31, 2025
- WonAug 25, 2025
- ScheduledSep 9, 2025
- CompletedSep 12, 2025