Lighting Retrofit Phase 1 — Lakemont Municipal Utility

Lakemont Municipal Utility · Building C — Loading Dock

$38,883
Lighting Retrofit

Scope of work

Replace fixtures, install controls, and verify light levels. Existing materials removed and disposed of.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material14/2 NM-B w/ Ground — 250 ft coil3 coil$128.13$384.39
Material6 in LED Recessed Downlight, Canless3 ea$29.36$88.08
MaterialLED High-Bay Fixture, 150W 5000K2 ea$187.46$374.92
Material10 AWG THHN Copper, Red — 500 ft spool3 spool$305.45$916.35
MaterialLED Troffer 2x4, 40W 4000K9 ea$109.89$989.01
EquipmentScissor lift rental5 day$405.65$2,028.25
LaborElectrical labour — lighting retrofit289 hr$118$34,101.79
Total$38,882.79

Activity

Notes on this job

  • AssistantApr 5

    Estimate drafted from the site notes and sent for review.

Customer

Open
Lakemont Municipal Utility
Desmond Mercer
Project Manager
7748 Sable Ridge Blvd
Lutz, FL 33933
Assigned crew
Crew 1 — Commercial

Timeline

  1. Lead created
    Mar 29, 2022
  2. Won
    Apr 7, 2022
  3. Scheduled
    Apr 20, 2022
  4. Completed
    Apr 27, 2022