JOB-1291Paid
Generator Transfer Switch — Lakemont Municipal Utility
Lakemont Municipal Utility · Building C — Loading Dock
$22,636
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| MaterialAir-Cooled Standby Generator, 22 kW | 1 ea | $6,581.52 | $6,581.52 |
| Material4/0 AWG Aluminum SER Cable | 41 ft | $8.22 | $337.02 |
| Material20A AFCI/GFCI Dual-Function Breaker | 8 ea | $77.40 | $619.20 |
| PermitPermit and inspection fees | 1 ea | $381.46 | $381.46 |
| LaborElectrical labour — generator install | 124.7 hr | $118.02 | $14,717.18 |
| Total | $22,636.38 | ||
Job photos
3 from the field · click to enlarge
Customer
Lakemont Municipal Utility
Desmond Mercer
Project Manager
7748 Sable Ridge Blvd
Lutz, FL 33933
Lutz, FL 33933
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdOct 14, 2025
- WonNov 11, 2025
- ScheduledNov 26, 2025
- CompletedNov 29, 2025