Ground-Up Electrical — 8,000 sq ft Shell, Brightwater Parks Department
Brightwater Parks Department · Building B — Warehouse
$89,525
New Construction Rough-In
Scope of work
Complete electrical rough-in per approved drawings. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, White — 500 ft spool | 3 spool | $200.81 | $602.43 |
| Material1/2 in EMT Conduit — 10 ft stick | 5 ea | $16.30 | $81.50 |
| Material20A Double-Pole Breaker | 3 ea | $36.97 | $110.91 |
| Material3/8 in Drop-In Anchor — 100 ct | 3 box | $73.14 | $219.42 |
| MaterialLED High-Bay Fixture, 150W 5000K | 6 ea | $187.46 | $1,124.76 |
| MaterialAddressable Smoke Detector w/ Base | 4 ea | $142.52 | $570.08 |
| PermitPermit and inspection fees | 1 ea | $217.93 | $217.93 |
| LaborElectrical labour — new construction rough-in | 733.9 hr | $118 | $86,597.62 |
| Total | $89,524.65 | ||
Customer
Brightwater Parks Department
Victor Whitaker
Facilities Director
3896 Pinecrest Commons
Plant City, FL 33962
Plant City, FL 33962
Timeline
- Lead createdMay 30, 2026
- Bid lostJun 13, 2026
Lost: Price — went with a lower bid