JOB-1334Lost

EV Charger Install — Level 2, 48A, Copperfield Medical Plaza

Copperfield Medical Plaza · Community Center

$7,012
EV Charger Install

Scope of work

Add EV charging capacity including panel work and conduit run. Existing materials removed and disposed of. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material6 AWG Bare Copper Ground106 ft$2.92$309.52
Material20A Double-Pole Breaker6 ea$36.97$221.82
Material20A AFCI/GFCI Dual-Function Breaker5 ea$77.40$387
Material100A Main Breaker Load Center, 24-space4 ea$308.66$1,234.64
LaborElectrical labour — ev charger install41.2 hr$117.94$4,859.03
Total$7,012.01

Activity

Notes on this job

  • AssistantApr 3

    Follow-up scheduled — no response to the estimate after 6 days.

  • EV
    Emmett VanceMar 14

    Customer asked to push a week. Rescheduled.

  • AssistantMar 11

    Estimate drafted from the site notes and sent for review.

Customer

Open
Copperfield Medical Plaza
Corey Fontaine
Facilities Director
4251 Sawgrass Reach Dr
Dunedin, FL 34674

Timeline

  1. Lead created
    Mar 9, 2025
  2. Bid lost
    Mar 25, 2025

Lost: Project cancelled by owner