Open
JOB-1334Lost
EV Charger Install — Level 2, 48A, Copperfield Medical Plaza
Copperfield Medical Plaza · Community Center
$7,012
EV Charger Install
Scope of work
Add EV charging capacity including panel work and conduit run. Existing materials removed and disposed of. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material6 AWG Bare Copper Ground | 106 ft | $2.92 | $309.52 |
| Material20A Double-Pole Breaker | 6 ea | $36.97 | $221.82 |
| Material20A AFCI/GFCI Dual-Function Breaker | 5 ea | $77.40 | $387 |
| Material100A Main Breaker Load Center, 24-space | 4 ea | $308.66 | $1,234.64 |
| LaborElectrical labour — ev charger install | 41.2 hr | $117.94 | $4,859.03 |
| Total | $7,012.01 | ||
Activity
Notes on this job
- AssistantApr 3
Follow-up scheduled — no response to the estimate after 6 days.
- EVEmmett VanceMar 14
Customer asked to push a week. Rescheduled.
- AssistantMar 11
Estimate drafted from the site notes and sent for review.
Customer
Copperfield Medical Plaza
Corey Fontaine
Facilities Director
4251 Sawgrass Reach Dr
Dunedin, FL 34674
Dunedin, FL 34674
Timeline
- Lead createdMar 9, 2025
- Bid lostMar 25, 2025
Lost: Project cancelled by owner