JOB-1335Lost

Standby Generator Install — 22 kW, Copperfield Medical Plaza

Copperfield Medical Plaza · Building A — Clubhouse

$22,399
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A Double-Pole Breaker6 ea$36.97$221.82
Material12 AWG THHN Copper, Black — 500 ft spool2 spool$200.81$401.62
Material400A Meter Main Combo, 42-space5 ea$1,721.36$8,606.80
Material14/2 NM-B w/ Ground — 250 ft coil2 coil$128.13$256.26
PermitPermit and inspection fees1 ea$132.65$132.65
LaborElectrical labour — generator install108.3 hr$118$12,779.64
Total$22,398.79

Activity

Notes on this job

  • JA
    Junia AldermanMay 16

    Inspection passed first time.

Customer

Open
Copperfield Medical Plaza
Corey Fontaine
Facilities Director
7525 Ironwood Commerce Dr
Lutz, FL 33732

Timeline

  1. Lead created
    May 6, 2026
  2. Bid lost
    May 29, 2026

Lost: Price — went with a lower bid