Standby Generator Install — 22 kW, Copperfield Medical Plaza
Copperfield Medical Plaza · Building A — Clubhouse
$22,399
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 6 ea | $36.97 | $221.82 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 2 spool | $200.81 | $401.62 |
| Material400A Meter Main Combo, 42-space | 5 ea | $1,721.36 | $8,606.80 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 2 coil | $128.13 | $256.26 |
| PermitPermit and inspection fees | 1 ea | $132.65 | $132.65 |
| LaborElectrical labour — generator install | 108.3 hr | $118 | $12,779.64 |
| Total | $22,398.79 | ||
Activity
Notes on this job
- JAJunia AldermanMay 16
Inspection passed first time.
Customer
Copperfield Medical Plaza
Corey Fontaine
Facilities Director
7525 Ironwood Commerce Dr
Lutz, FL 33732
Lutz, FL 33732
Timeline
- Lead createdMay 6, 2026
- Bid lostMay 29, 2026
Lost: Price — went with a lower bid