JOB-1373Lost
EV Charger Install — Level 2, 48A, Silverbrook Municipal Utility
Silverbrook Municipal Utility · Warehouse
$11,351
EV Charger Install
Scope of work
Install Level 2 EV charging equipment with dedicated circuit. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material14/2 NM-B w/ Ground — 250 ft coil | 2 coil | $128.13 | $256.26 |
| Material10 AWG THHN Copper, Red — 500 ft spool | 1 spool | $305.45 | $305.45 |
| Material20A Double-Pole Breaker | 9 ea | $36.97 | $332.73 |
| Material4/0 AWG Aluminum SER Cable | 254 ft | $8.22 | $2,087.88 |
| Material50A Double-Pole Breaker | 1 ea | $58.90 | $58.90 |
| LaborElectrical labour — ev charger install | 70.4 hr | $118.04 | $8,309.89 |
| Total | $11,351.11 | ||
Customer
Silverbrook Municipal Utility
Emmett Hollingsworth
Operations Manager
3165 Lakemont Loop
Safety Harbor, FL 34624
Safety Harbor, FL 34624
Timeline
- Lead createdMar 30, 2026
- Bid lostApr 14, 2026
Lost: Price — went with a lower bid