Fire Alarm Device Replacement Phase 3 — Sable Ridge Distribution Center

Sable Ridge Distribution Center · Loading Dock

$11,482
Fire Alarm / Low Voltage

Scope of work

Install and commission fire alarm devices per approved plan. Final walkthrough with customer before sign-off. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material3/4 in EMT Compression Coupling11 ea$4.49$49.39
Material1/2 in EMT Set-Screw Connector1 ea$2.07$2.07
MaterialCat6A Riser Cable — 1000 ft box1 box$354.35$354.35
MaterialAddressable Fire Alarm Pull Station4 ea$117.98$471.92
Material1/2 in EMT Conduit — 10 ft stick4 ea$16.30$65.20
MaterialUnistrut Channel — 10 ft5 ea$59.06$295.30
PermitPermit and inspection fees1 ea$167.97$167.97
LaborElectrical labour — fire alarm / low voltage85.4 hr$117.98$10,075.66
Total$11,481.86

Activity

Notes on this job

  • AssistantApr 12

    Follow-up scheduled — no response to the estimate after 6 days.

  • JA
    Junia AldermanApr 5

    Materials staged at the shop, ready for Monday.

  • EV
    Emmett VanceApr 1

    Walked the site with the customer. Scope confirmed, no surprises.

Customer

Open
Sable Ridge Distribution Center
Malik Alderman
Property Manager
8133 Silverbrook Path
Plant City, FL 33632
Assigned crew
Crew 1 — Commercial

Timeline

  1. Lead created
    Mar 23, 2023
  2. Won
    Apr 9, 2023
  3. Scheduled
    Apr 12, 2023
  4. Completed
    Apr 16, 2023