JOB-1399Paid
Fire Alarm Device Replacement Phase 3 — Sable Ridge Distribution Center
Sable Ridge Distribution Center · Loading Dock
$11,482
Fire Alarm / Low Voltage
Scope of work
Install and commission fire alarm devices per approved plan. Final walkthrough with customer before sign-off. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material3/4 in EMT Compression Coupling | 11 ea | $4.49 | $49.39 |
| Material1/2 in EMT Set-Screw Connector | 1 ea | $2.07 | $2.07 |
| MaterialCat6A Riser Cable — 1000 ft box | 1 box | $354.35 | $354.35 |
| MaterialAddressable Fire Alarm Pull Station | 4 ea | $117.98 | $471.92 |
| Material1/2 in EMT Conduit — 10 ft stick | 4 ea | $16.30 | $65.20 |
| MaterialUnistrut Channel — 10 ft | 5 ea | $59.06 | $295.30 |
| PermitPermit and inspection fees | 1 ea | $167.97 | $167.97 |
| LaborElectrical labour — fire alarm / low voltage | 85.4 hr | $117.98 | $10,075.66 |
| Total | $11,481.86 | ||
Activity
Notes on this job
- AssistantApr 12
Follow-up scheduled — no response to the estimate after 6 days.
- JAJunia AldermanApr 5
Materials staged at the shop, ready for Monday.
- EVEmmett VanceApr 1
Walked the site with the customer. Scope confirmed, no surprises.
Customer
Sable Ridge Distribution Center
Malik Alderman
Property Manager
8133 Silverbrook Path
Plant City, FL 33632
Plant City, FL 33632
Assigned crew
Crew 1 — Commercial
Timeline
- Lead createdMar 23, 2023
- WonApr 9, 2023
- ScheduledApr 12, 2023
- CompletedApr 16, 2023