JOB-1424Lost
EV Charging Expansion Phase 1 — Ironwood Event Hall
Ironwood Event Hall · Primary Site
$5,467
EV Charger Install
Scope of work
Install Level 2 EV charging equipment with dedicated circuit. Existing materials removed and disposed of. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material8 AWG THHN Copper — 500 ft spool | 1 spool | $484.38 | $484.38 |
| Material4/0 AWG Aluminum SER Cable | 107 ft | $8.22 | $879.54 |
| MaterialType 2 Whole-Home Surge Protective Device | 2 ea | $260.71 | $521.42 |
| Material20A Double-Pole Breaker | 2 ea | $36.97 | $73.94 |
| LaborElectrical labour — ev charger install | 29.7 hr | $118.11 | $3,507.87 |
| Total | $5,467.15 | ||
Activity
Notes on this job
- JAJunia AldermanMar 19
Found existing wiring in worse shape than quoted. Flagged to customer.
Customer
Ironwood Event Hall
Dominic Thackeray
Operations Manager
9067 Sawgrass Reach Dr
Clearwater, FL 34684
Clearwater, FL 34684
Timeline
- Lead createdMar 8, 2025
- Bid lostMar 23, 2025
Lost: Went with incumbent contractor