Command Palette
Search for a command to run...
Board
Open
JOB-1444Lost
Panel Upgrade — 200A Service + Surge Protection, Riverside Retail Plaza
Riverside Retail Plaza · Building C — Maintenance Shop
$6,198
Panel Upgrade
Scope of work
Upgrade electrical service, including meter main and grounding. Final walkthrough with customer before sign-off. Includes as-built markup on completion.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 11 ea | $36.97 | $406.67 |
| Material50A Double-Pole Breaker | 10 ea | $58.90 | $589 |
| Material100A Main Breaker Load Center, 24-space | 4 ea | $308.66 | $1,234.64 |
| Material12/3 NM-B w/ Ground — 250 ft coil | 1 coil | $253.23 | $253.23 |
| PermitPermit and inspection fees | 1 ea | $438.10 | $438.10 |
| LaborElectrical labour — panel upgrade | 27.8 hr | $117.84 | $3,276.07 |
| Total | $6,197.71 | ||
Activity
Notes on this job
- EVEmmett VanceNov 7
Found existing wiring in worse shape than quoted. Flagged to customer.
Customer
Riverside Retail Plaza
Yolanda Ellsworth
Operations Manager
8928 Clearpoint Sq
Riverview, FL 34118
Riverview, FL 34118
Timeline
- Lead createdOct 16, 2025
- Bid lostOct 29, 2025
Lost: Went with incumbent contractor
