JOB-1448Paid
EV Charging Expansion Phase 3 — Ironwood Event Hall
Ironwood Event Hall · Primary Site
$7,828
EV Charger Install
Scope of work
Install Level 2 EV charging equipment with dedicated circuit. Existing materials removed and disposed of. Includes as-built markup on completion.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, Black — 500 ft spool | 3 spool | $200.81 | $602.43 |
| Material50A Double-Pole Breaker | 3 ea | $58.90 | $176.70 |
| LaborElectrical labour — ev charger install | 59.7 hr | $118.07 | $7,048.63 |
| Total | $7,827.76 | ||
Job photos
4 from the field · click to enlarge
Customer
Ironwood Event Hall
Dominic Thackeray
Operations Manager
9067 Sawgrass Reach Dr
Clearwater, FL 34684
Clearwater, FL 34684
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdMay 27, 2025
- WonJun 13, 2025
- ScheduledJun 23, 2025
- CompletedJun 27, 2025