Generator Install + 100A ATS — Osprey Landing Bowling Center
Osprey Landing Bowling Center · Loading Dock
$25,352
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A AFCI/GFCI Dual-Function Breaker | 1 ea | $77.40 | $77.40 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 2 coil | $128.13 | $256.26 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 1 spool | $200.81 | $200.81 |
| Material12/3 NM-B w/ Ground — 250 ft coil | 1 coil | $253.23 | $253.23 |
| Material8 AWG THHN Copper — 500 ft spool | 1 spool | $484.38 | $484.38 |
| PermitPermit and inspection fees | 1 ea | $137.33 | $137.33 |
| LaborElectrical labour — generator install | 202.9 hr | $118 | $23,942.98 |
| Total | $25,352.39 | ||
Job photos
3 from the field · click to enlarge
Customer
Osprey Landing Bowling Center
Grant Hollingsworth
Business Manager
4105 Harborlight Way
Brandon, FL 33785
Brandon, FL 33785
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdOct 9, 2025
- WonOct 27, 2025
- ScheduledNov 22, 2025
- CompletedNov 29, 2025