Generator Install + 400A ATS — Osprey Landing Bowling Center
Osprey Landing Bowling Center · Building D — Annex
$17,740
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| MaterialAutomatic Transfer Switch, 200A | 4 ea | $1,553.66 | $6,214.64 |
| Material12/3 NM-B w/ Ground — 250 ft coil | 3 coil | $253.23 | $759.69 |
| Material20A Double-Pole Breaker | 1 ea | $36.97 | $36.97 |
| Material4/0 AWG Aluminum SER Cable | 165 ft | $8.22 | $1,356.30 |
| Material8 AWG THHN Copper — 500 ft spool | 1 spool | $484.38 | $484.38 |
| PermitPermit and inspection fees | 1 ea | $145.65 | $145.65 |
| LaborElectrical labour — generator install | 74.1 hr | $117.98 | $8,742.54 |
| Total | $17,740.17 | ||
Customer
Osprey Landing Bowling Center
Grant Hollingsworth
Business Manager
4878 Sawgrass Reach Dr
Dunedin, FL 34072
Dunedin, FL 34072
Timeline
- Lead createdAug 5, 2025
- Bid lostAug 27, 2025
Lost: Price — went with a lower bid