JOB-1476Paid

Generator Install + 400A ATS — Northline HOA

Northline HOA · Primary Site

$15,203
Generator Install

Scope of work

Install standby generator with automatic transfer switch. Work to be performed outside business hours.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material6 AWG Bare Copper Ground300 ft$2.92$876
Material50A Double-Pole Breaker12 ea$58.90$706.80
Material10 AWG THHN Copper, Red — 500 ft spool3 spool$305.45$916.35
Material400A Meter Main Combo, 42-space3 ea$1,721.36$5,164.08
Material20A AFCI/GFCI Dual-Function Breaker3 ea$77.40$232.20
MaterialType 2 Whole-Home Surge Protective Device2 ea$260.71$521.42
PermitPermit and inspection fees1 ea$427.05$427.05
LaborElectrical labour — generator install53.9 hr$117.98$6,359.05
Total$15,202.95

Job photos

2 from the field · click to enlarge

Customer

Open
Northline HOA
Nadia Ivory
Property Manager
9556 Harborlight Way
Oldsmar, FL 34648
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Dec 1, 2023
  2. Won
    Dec 21, 2023
  3. Scheduled
    Jan 8, 2024
  4. Completed
    Jan 17, 2024