2

Command Palette

Search for a command to run...

Board
JOB-1529Paid

Generator Install + 400A ATS — Brightwater Fellowship Church

Brightwater Fellowship Church · Building C — Unit Block

$16,209
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. Existing materials removed and disposed of. Final walkthrough with customer before sign-off.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material8 AWG THHN Copper — 500 ft spool1 spool$484.38$484.38
Material200A Main Breaker Load Center, 40-space8 ea$609.04$4,872.32
Material6 AWG Bare Copper Ground354 ft$2.92$1,033.68
Material12 AWG THHN Copper, Black — 500 ft spool2 spool$200.81$401.62
Material20A Double-Pole Breaker5 ea$36.97$184.85
Material20A AFCI/GFCI Dual-Function Breaker5 ea$77.40$387
PermitPermit and inspection fees1 ea$430.40$430.40
LaborElectrical labour — generator install71.3 hr$118.01$8,414.41
Total$16,208.66

Customer

Open
Brightwater Fellowship Church
Grant Sandoval
Operations Manager
1950 Brightwater Ave
St. Petersburg, FL 33996
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    May 14, 2024
  2. Won
    Jun 6, 2024
  3. Scheduled
    Jul 1, 2024
  4. Completed
    Jul 4, 2024

Documents