Command Palette
Search for a command to run...
Board
Open
JOB-1529Paid
Generator Install + 400A ATS — Brightwater Fellowship Church
Brightwater Fellowship Church · Building C — Unit Block
$16,209
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. Existing materials removed and disposed of. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material8 AWG THHN Copper — 500 ft spool | 1 spool | $484.38 | $484.38 |
| Material200A Main Breaker Load Center, 40-space | 8 ea | $609.04 | $4,872.32 |
| Material6 AWG Bare Copper Ground | 354 ft | $2.92 | $1,033.68 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 2 spool | $200.81 | $401.62 |
| Material20A Double-Pole Breaker | 5 ea | $36.97 | $184.85 |
| Material20A AFCI/GFCI Dual-Function Breaker | 5 ea | $77.40 | $387 |
| PermitPermit and inspection fees | 1 ea | $430.40 | $430.40 |
| LaborElectrical labour — generator install | 71.3 hr | $118.01 | $8,414.41 |
| Total | $16,208.66 | ||
Customer
Brightwater Fellowship Church
Grant Sandoval
Operations Manager
1950 Brightwater Ave
St. Petersburg, FL 33996
St. Petersburg, FL 33996
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdMay 14, 2024
- WonJun 6, 2024
- ScheduledJul 1, 2024
- CompletedJul 4, 2024
