Generator Install + 400A ATS — Brightwater Fellowship Church

Brightwater Fellowship Church · Warehouse

$24,063
Generator Install

Scope of work

Install standby generator with automatic transfer switch. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material400A Meter Main Combo, 42-space6 ea$1,721.36$10,328.16
Material12 AWG THHN Copper, White — 500 ft spool2 spool$200.81$401.62
Material6 AWG Bare Copper Ground16 ft$2.92$46.72
PermitPermit and inspection fees1 ea$158.19$158.19
LaborElectrical labour — generator install111.3 hr$117.95$13,128.38
Total$24,063.07

Customer

Open
Brightwater Fellowship Church
Grant Sandoval
Operations Manager
1280 Sable Ridge Blvd
Lutz, FL 33643
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Oct 17, 2024
  2. Won
    Nov 11, 2024
  3. Scheduled
    Nov 26, 2024
  4. Completed
    Nov 29, 2024