JOB-1550Invoiced
Generator Install + 100A ATS — Brightwater Fellowship Church
Brightwater Fellowship Church · Warehouse
$17,611
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. All work per NEC and local amendments. Includes as-built markup on completion.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material6 AWG Bare Copper Ground | 218 ft | $2.92 | $636.56 |
| Material100A Main Breaker Load Center, 24-space | 4 ea | $308.66 | $1,234.64 |
| Material8 AWG THHN Copper — 500 ft spool | 3 spool | $484.38 | $1,453.14 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 1 coil | $128.13 | $128.13 |
| Material20A Double-Pole Breaker | 1 ea | $36.97 | $36.97 |
| PermitPermit and inspection fees | 1 ea | $226.76 | $226.76 |
| LaborElectrical labour — generator install | 117.7 hr | $118.05 | $13,894.48 |
| Total | $17,610.68 | ||
Customer
Brightwater Fellowship Church
Grant Sandoval
Operations Manager
1280 Sable Ridge Blvd
Lutz, FL 33643
Lutz, FL 33643
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdMay 14, 2026
- WonJun 10, 2026
- ScheduledJun 15, 2026
- CompletedJun 21, 2026