JOB-1550Invoiced

Generator Install + 100A ATS — Brightwater Fellowship Church

Brightwater Fellowship Church · Warehouse

$17,611
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. All work per NEC and local amendments. Includes as-built markup on completion.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material6 AWG Bare Copper Ground218 ft$2.92$636.56
Material100A Main Breaker Load Center, 24-space4 ea$308.66$1,234.64
Material8 AWG THHN Copper — 500 ft spool3 spool$484.38$1,453.14
Material14/2 NM-B w/ Ground — 250 ft coil1 coil$128.13$128.13
Material20A Double-Pole Breaker1 ea$36.97$36.97
PermitPermit and inspection fees1 ea$226.76$226.76
LaborElectrical labour — generator install117.7 hr$118.05$13,894.48
Total$17,610.68

Customer

Open
Brightwater Fellowship Church
Grant Sandoval
Operations Manager
1280 Sable Ridge Blvd
Lutz, FL 33643
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    May 14, 2026
  2. Won
    Jun 10, 2026
  3. Scheduled
    Jun 15, 2026
  4. Completed
    Jun 21, 2026