New Construction Rough-In — Main Building, Kingfisher Car Wash

Kingfisher Car Wash · Unit Block

$94,155
New Construction Rough-In

Scope of work

Complete electrical rough-in per approved drawings. Includes as-built markup on completion. Work to be performed outside business hours.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A AFCI/GFCI Dual-Function Breaker6 ea$77.40$464.40
Material2 in EMT Conduit — 10 ft stick12 ea$65.21$782.52
MaterialLED Parking Lot Fixture, 240W Type III4 ea$541.10$2,164.40
Material12 AWG THHN Copper, Black — 500 ft spool1 spool$200.81$200.81
MaterialLevel 2 EV Charger, 48A Hardwired9 ea$862.22$7,759.98
Material14/2 NM-B w/ Ground — 250 ft coil3 coil$128.13$384.39
PermitPermit and inspection fees1 ea$167.72$167.72
LaborElectrical labour — new construction rough-in696.9 hr$117.99$82,230.34
Total$94,154.56

Job photos

4 from the field · click to enlarge

Customer

Open
Kingfisher Car Wash
Marisol Hollingsworth
Maintenance Supervisor
3374 Heron Cove Ct
Tampa, FL 34455
Assigned crew
Crew 1 — Commercial

Timeline

  1. Lead created
    Jul 4, 2022
  2. Won
    Jul 20, 2022
  3. Scheduled
    Jul 25, 2022
  4. Completed
    Jul 30, 2022