EV Charging Expansion Phase 1 — Sable Ridge Marina
Sable Ridge Marina · Unit Block
$7,614
EV Charger Install
Scope of work
Install Level 2 EV charging equipment with dedicated circuit. Permit and inspection included. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 5 ea | $36.97 | $184.85 |
| MaterialType 2 Whole-Home Surge Protective Device | 9 ea | $260.71 | $2,346.39 |
| Material12 AWG THHN Copper, White — 500 ft spool | 1 spool | $200.81 | $200.81 |
| LaborElectrical labour — ev charger install | 41.4 hr | $117.93 | $4,882.20 |
| Total | $7,614.25 | ||
Job photos
1 from the field · click to enlarge
Activity
Notes on this job
- EVEmmett VanceAug 14
Materials staged at the shop, ready for Monday.
- JAJunia AldermanAug 12
Found existing wiring in worse shape than quoted. Flagged to customer.
Customer
Sable Ridge Marina
Silas Dunmore
Property Manager
7886 Copperfield Row
Dunedin, FL 33928
Dunedin, FL 33928
Assigned crew
Crew 1 — Commercial
Timeline
- Lead createdJul 25, 2026
- WonAug 11, 2026
- ScheduledAug 24, 2026