EV Charger Install

Scope of work

Install Level 2 EV charging equipment with dedicated circuit. Permit and inspection included. Final walkthrough with customer before sign-off.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A Double-Pole Breaker5 ea$36.97$184.85
MaterialType 2 Whole-Home Surge Protective Device9 ea$260.71$2,346.39
Material12 AWG THHN Copper, White — 500 ft spool1 spool$200.81$200.81
LaborElectrical labour — ev charger install41.4 hr$117.93$4,882.20
Total$7,614.25

Job photos

1 from the field · click to enlarge

Activity

Notes on this job

  • EV
    Emmett VanceAug 14

    Materials staged at the shop, ready for Monday.

  • JA
    Junia AldermanAug 12

    Found existing wiring in worse shape than quoted. Flagged to customer.

Customer

Open
Sable Ridge Marina
Silas Dunmore
Property Manager
7886 Copperfield Row
Dunedin, FL 33928
Assigned crew
Crew 1 — Commercial

Timeline

  1. Lead created
    Jul 25, 2026
  2. Won
    Aug 11, 2026
  3. Scheduled
    Aug 24, 2026