Generator Install + 400A ATS — Palm Terrace Distribution Center
Palm Terrace Distribution Center · Building B — Pump House
$19,158
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. Includes as-built markup on completion. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material200A Main Breaker Load Center, 40-space | 10 ea | $609.04 | $6,090.40 |
| Material12 AWG THHN Copper, White — 500 ft spool | 2 spool | $200.81 | $401.62 |
| Material400A Meter Main Combo, 42-space | 1 ea | $1,721.36 | $1,721.36 |
| PermitPermit and inspection fees | 1 ea | $298.60 | $298.60 |
| LaborElectrical labour — generator install | 90.2 hr | $118.02 | $10,645.75 |
| Total | $19,157.73 | ||
Customer
Palm Terrace Distribution Center
Hollis Langford
Operations Manager
4268 Sable Ridge Blvd
Dunedin, FL 33819
Dunedin, FL 33819
Timeline
- Lead createdMar 13, 2026
- Bid lostApr 3, 2026
Lost: Went with incumbent contractor