Command Palette
Search for a command to run...
Board
Open
JOB-1597Paid
Fire Alarm System Upgrade — Palm Terrace Distribution Center
Palm Terrace Distribution Center · Building B — Pump House
$31,797
Fire Alarm / Low Voltage
Scope of work
Install and commission fire alarm devices per approved plan. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material1/2 in EMT Conduit — 10 ft stick | 1 ea | $16.30 | $16.30 |
| MaterialCat6A Riser Cable — 1000 ft box | 4 box | $354.35 | $1,417.40 |
| MaterialUnistrut Channel — 10 ft | 1 ea | $59.06 | $59.06 |
| PermitPermit and inspection fees | 1 ea | $211.61 | $211.61 |
| LaborElectrical labour — fire alarm / low voltage | 255 hr | $118.01 | $30,092.16 |
| Total | $31,796.53 | ||
Job photos
3 from the field · click to enlarge
Customer
Palm Terrace Distribution Center
Hollis Langford
Operations Manager
4268 Sable Ridge Blvd
Dunedin, FL 33819
Dunedin, FL 33819
Assigned crew
Crew 1 — Commercial
Timeline
- Lead createdJul 8, 2025
- WonJul 26, 2025
- ScheduledAug 1, 2025
- CompletedAug 2, 2025
