Command Palette
Search for a command to run...
Board
Open
JOB-1598Paid
Generator Transfer Switch — Oakfield Apartments
Oakfield Apartments · Main Building
$22,248
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Includes as-built markup on completion. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| MaterialAir-Cooled Standby Generator, 22 kW | 1 ea | $6,581.52 | $6,581.52 |
| Material20A Double-Pole Breaker | 11 ea | $36.97 | $406.67 |
| Material10 AWG THHN Copper, Red — 500 ft spool | 1 spool | $305.45 | $305.45 |
| Material200A Main Breaker Load Center, 40-space | 6 ea | $609.04 | $3,654.24 |
| Material100A Main Breaker Load Center, 24-space | 1 ea | $308.66 | $308.66 |
| PermitPermit and inspection fees | 1 ea | $155.82 | $155.82 |
| LaborElectrical labour — generator install | 91.8 hr | $118.04 | $10,836.08 |
| Total | $22,248.44 | ||
Activity
Notes on this job
- EVEmmett VanceAug 30
Walked the site with the customer. Scope confirmed, no surprises.
- AssistantAug 22
Follow-up scheduled — no response to the estimate after 6 days.
- JAJunia AldermanAug 2
Permit submitted. Waiting on the county.
Customer
Oakfield Apartments
Silas Delacroix
Property Manager
6634 Tidewater Crossing
Lutz, FL 33603
Lutz, FL 33603
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdJul 31, 2025
- WonAug 20, 2025
- ScheduledSep 11, 2025
- CompletedSep 16, 2025