Generator Install + 100A ATS — Whitecap Charter Academy
Whitecap Charter Academy · Building A — Storage Wing
$23,182
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Includes as-built markup on completion. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material6 AWG Bare Copper Ground | 103 ft | $2.92 | $300.76 |
| Material12 AWG THHN Copper, White — 500 ft spool | 1 spool | $200.81 | $200.81 |
| MaterialLevel 2 EV Charger, 48A Hardwired | 3 ea | $862.22 | $2,586.66 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 3 spool | $200.81 | $602.43 |
| Material4/0 AWG Aluminum SER Cable | 329 ft | $8.22 | $2,704.38 |
| PermitPermit and inspection fees | 1 ea | $409.83 | $409.83 |
| LaborElectrical labour — generator install | 138.8 hr | $117.99 | $16,376.82 |
| Total | $23,181.69 | ||
Activity
Notes on this job
- JAJunia AldermanJul 23
Customer asked to push a week. Rescheduled.
- AssistantJul 5
Follow-up scheduled — no response to the estimate after 6 days.
Customer
Whitecap Charter Academy
Rosalind Whitaker
Property Manager
8767 Lakemont Loop
Brandon, FL 33943
Brandon, FL 33943
Timeline
- Lead createdJul 5, 2023
- Bid lostJul 20, 2023
Lost: Went with incumbent contractor