JOB-1645Lost

Generator Install + 100A ATS — Whitecap Charter Academy

Whitecap Charter Academy · Building A — Storage Wing

$23,182
Generator Install

Scope of work

Install standby generator with automatic transfer switch. Includes as-built markup on completion. Existing materials removed and disposed of.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material6 AWG Bare Copper Ground103 ft$2.92$300.76
Material12 AWG THHN Copper, White — 500 ft spool1 spool$200.81$200.81
MaterialLevel 2 EV Charger, 48A Hardwired3 ea$862.22$2,586.66
Material12 AWG THHN Copper, Black — 500 ft spool3 spool$200.81$602.43
Material4/0 AWG Aluminum SER Cable329 ft$8.22$2,704.38
PermitPermit and inspection fees1 ea$409.83$409.83
LaborElectrical labour — generator install138.8 hr$117.99$16,376.82
Total$23,181.69

Activity

Notes on this job

  • JA
    Junia AldermanJul 23

    Customer asked to push a week. Rescheduled.

  • AssistantJul 5

    Follow-up scheduled — no response to the estimate after 6 days.

Customer

Open
Whitecap Charter Academy
Rosalind Whitaker
Property Manager
8767 Lakemont Loop
Brandon, FL 33943

Timeline

  1. Lead created
    Jul 5, 2023
  2. Bid lost
    Jul 20, 2023

Lost: Went with incumbent contractor