Command Palette
Search for a command to run...
Board
Open
JOB-1658Paid
EV Charger Install — Level 2, 48A, Stonegate School District
Stonegate School District · Building C — Storage Wing
$5,276
EV Charger Install
Scope of work
Install Level 2 EV charging equipment with dedicated circuit. Customer to provide site access during working hours. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 8 ea | $36.97 | $295.76 |
| Material20A Single-Pole Breaker | 10 ea | $16.25 | $162.50 |
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| Material100A Main Breaker Load Center, 24-space | 1 ea | $308.66 | $308.66 |
| Material4/0 AWG Aluminum SER Cable | 19 ft | $8.22 | $156.18 |
| LaborElectrical labour — ev charger install | 28.7 hr | $117.91 | $3,384.02 |
| Total | $5,275.88 | ||
Job photos
2 from the field · click to enlarge
Customer
Stonegate School District
Marcus Cardoza
Maintenance Supervisor
7433 Tidewater Crossing
Tampa, FL 34371
Tampa, FL 34371
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdAug 16, 2022
- WonSep 5, 2022
- ScheduledSep 13, 2022
- CompletedSep 20, 2022