Command Palette
Search for a command to run...
Board
Open
JOB-1664Paid
Generator Install + 400A ATS — Stonegate School District
Stonegate School District · Building C — Storage Wing
$26,463
Generator Install
Scope of work
Set generator pad, run gas and electrical, commission unit. All work per NEC and local amendments. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material14/2 NM-B w/ Ground — 250 ft coil | 2 coil | $128.13 | $256.26 |
| MaterialCommercial Dual-Port EV Pedestal | 2 ea | $4,994.60 | $9,989.20 |
| Material100A Main Breaker Load Center, 24-space | 5 ea | $308.66 | $1,543.30 |
| Material50A Double-Pole Breaker | 3 ea | $58.90 | $176.70 |
| PermitPermit and inspection fees | 1 ea | $468.24 | $468.24 |
| LaborElectrical labour — generator install | 118.9 hr | $117.99 | $14,029.06 |
| Total | $26,462.76 | ||
Customer
Stonegate School District
Marcus Cardoza
Maintenance Supervisor
7433 Tidewater Crossing
Tampa, FL 34371
Tampa, FL 34371
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdJan 20, 2025
- WonFeb 17, 2025
- ScheduledMar 12, 2025
- CompletedMar 13, 2025
