Command Palette
Search for a command to run...
Board
Open
JOB-1680Lost
Partial Rewire — Knob & Tube Removal, Whitecap Estates
Whitecap Estates · Building D — Main Building
$16,445
Rewire
Scope of work
Remove obsolete wiring and install new circuits to code. Existing materials removed and disposed of. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, White — 500 ft spool | 2 spool | $200.81 | $401.62 |
| Material50A Double-Pole Breaker | 1 ea | $58.90 | $58.90 |
| Material12/3 NM-B w/ Ground — 250 ft coil | 1 coil | $253.23 | $253.23 |
| MaterialLED Exit Sign w/ Battery Backup | 4 ea | $66.07 | $264.28 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 3 spool | $200.81 | $602.43 |
| PermitPermit and inspection fees | 1 ea | $408.28 | $408.28 |
| LaborElectrical labour — rewire | 122.5 hr | $118.01 | $14,456.47 |
| Total | $16,445.21 | ||
Activity
Notes on this job
- AssistantMay 15
Estimate drafted from the site notes and sent for review.
- JAJunia AldermanMay 8
Inspection passed first time.
Customer
Whitecap Estates
Silas Mercer
Property Manager
3040 Harborlight Way
Brandon, FL 33639
Brandon, FL 33639
Timeline
- Lead createdMay 8, 2025
- Bid lostMay 27, 2025
Lost: Went with incumbent contractor
