Command Palette
Search for a command to run...
Board
Open
JOB-1681Lost
Panel Upgrade — 200A Service + Surge Protection, Whitecap Estates
Whitecap Estates · Building B — Community Center
$6,077
Panel Upgrade
Scope of work
Upgrade electrical service, including meter main and grounding. Permit and inspection included. Final walkthrough with customer before sign-off.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, White — 500 ft spool | 1 spool | $200.81 | $200.81 |
| Material12/3 NM-B w/ Ground — 250 ft coil | 2 coil | $253.23 | $506.46 |
| Material6 AWG Bare Copper Ground | 347 ft | $2.92 | $1,013.24 |
| Material100A Main Breaker Load Center, 24-space | 2 ea | $308.66 | $617.32 |
| Material20A Single-Pole Breaker | 6 ea | $16.25 | $97.50 |
| PermitPermit and inspection fees | 1 ea | $188.83 | $188.83 |
| LaborElectrical labour — panel upgrade | 29.3 hr | $117.84 | $3,452.63 |
| Total | $6,076.79 | ||
Activity
Notes on this job
- AssistantSep 1
Estimate drafted from the site notes and sent for review.
Customer
Whitecap Estates
Silas Mercer
Property Manager
9534 Marsh Landing Pkwy
Dunedin, FL 34228
Dunedin, FL 34228
Timeline
- Lead createdAug 3, 2025
- Bid lostAug 25, 2025
Lost: Price — went with a lower bid
