Panel Upgrade — 200A Service + Surge Protection, Whitecap Estates

Whitecap Estates · Building B — Community Center

$6,077
Panel Upgrade

Scope of work

Upgrade electrical service, including meter main and grounding. Permit and inspection included. Final walkthrough with customer before sign-off.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material12 AWG THHN Copper, White — 500 ft spool1 spool$200.81$200.81
Material12/3 NM-B w/ Ground — 250 ft coil2 coil$253.23$506.46
Material6 AWG Bare Copper Ground347 ft$2.92$1,013.24
Material100A Main Breaker Load Center, 24-space2 ea$308.66$617.32
Material20A Single-Pole Breaker6 ea$16.25$97.50
PermitPermit and inspection fees1 ea$188.83$188.83
LaborElectrical labour — panel upgrade29.3 hr$117.84$3,452.63
Total$6,076.79

Activity

Notes on this job

  • AssistantSep 1

    Estimate drafted from the site notes and sent for review.

Customer

Open
Whitecap Estates
Silas Mercer
Property Manager
9534 Marsh Landing Pkwy
Dunedin, FL 34228

Timeline

  1. Lead created
    Aug 3, 2025
  2. Bid lost
    Aug 25, 2025

Lost: Price — went with a lower bid