JOB-1686Paid

Generator Transfer Switch — Whitecap Estates

Whitecap Estates · Loading Dock

$22,559
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. Existing materials removed and disposed of.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
MaterialType 2 Whole-Home Surge Protective Device2 ea$260.71$521.42
Material12 AWG THHN Copper, Black — 500 ft spool1 spool$200.81$200.81
Material20A AFCI/GFCI Dual-Function Breaker3 ea$77.40$232.20
Material20A Double-Pole Breaker10 ea$36.97$369.70
Material20A Single-Pole Breaker11 ea$16.25$178.75
Material12/3 NM-B w/ Ground — 250 ft coil2 coil$253.23$506.46
PermitPermit and inspection fees1 ea$154.68$154.68
LaborElectrical labour — generator install172.8 hr$118.03$20,394.73
Total$22,558.75

Activity

Notes on this job

  • AssistantNov 19

    Estimate drafted from the site notes and sent for review.

  • EV
    Emmett VanceNov 10

    Walked the site with the customer. Scope confirmed, no surprises.

Customer

Open
Whitecap Estates
Silas Mercer
Property Manager
4731 Brightwater Ave
Plant City, FL 34402
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Oct 25, 2024
  2. Won
    Nov 18, 2024
  3. Scheduled
    Dec 4, 2024
  4. Completed
    Dec 12, 2024