JOB-1753Paid

Panel Upgrade — 100A Service + Surge Protection, Whitecap Estates

Whitecap Estates · Loading Dock

$5,608
Panel Upgrade

Scope of work

Upgrade electrical service, including meter main and grounding. Includes as-built markup on completion. Existing materials removed and disposed of.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A Double-Pole Breaker12 ea$36.97$443.64
Material20A Single-Pole Breaker3 ea$16.25$48.75
Material200A Main Breaker Load Center, 40-space2 ea$609.04$1,218.08
PermitPermit and inspection fees1 ea$396.26$396.26
LaborElectrical labour — panel upgrade29.7 hr$117.90$3,501.54
Total$5,608.27

Job photos

4 from the field · click to enlarge

Customer

Open
Whitecap Estates
Silas Mercer
Property Manager
4731 Brightwater Ave
Plant City, FL 34402
Assigned crew
Crew 2 — Service

Timeline

  1. Lead created
    Dec 16, 2022
  2. Won
    Dec 28, 2022
  3. Scheduled
    Jan 2, 2023
  4. Completed
    Jan 8, 2023