JOB-1760Lost

Generator Install + 400A ATS — Silverbrook Condominium Association

Silverbrook Condominium Association · Building B — Loading Dock

$25,331
Generator Install

Scope of work

Install standby generator with automatic transfer switch. Final walkthrough with customer before sign-off. Includes as-built markup on completion.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material100A Main Breaker Load Center, 24-space4 ea$308.66$1,234.64
Material20A Single-Pole Breaker10 ea$16.25$162.50
Material6 AWG Bare Copper Ground51 ft$2.92$148.92
PermitPermit and inspection fees1 ea$141.95$141.95
LaborElectrical labour — generator install200.4 hr$117.98$23,643.01
Total$25,331.02

Activity

Notes on this job

  • EV
    Emmett VanceJan 8

    Inspection passed first time.

Customer

Open
Silverbrook Condominium Association
Owen Okafor
Property Manager
5057 Stonegate Cir
Temple Terrace, FL 33792

Timeline

  1. Lead created
    Dec 29, 2025
  2. Bid lost
    Jan 18, 2026

Lost: Went with incumbent contractor