Command Palette
Search for a command to run...
Board
Open
JOB-1761Paid
Generator Transfer Switch — Silverbrook Condominium Association
Silverbrook Condominium Association · Building A — Storage Wing
$12,641
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, White — 500 ft spool | 1 spool | $200.81 | $200.81 |
| Material100A Main Breaker Load Center, 24-space | 2 ea | $308.66 | $617.32 |
| Material200A Main Breaker Load Center, 40-space | 9 ea | $609.04 | $5,481.36 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 3 coil | $128.13 | $384.39 |
| PermitPermit and inspection fees | 1 ea | $192.50 | $192.50 |
| LaborElectrical labour — generator install | 48.9 hr | $117.89 | $5,764.92 |
| Total | $12,641.30 | ||
Job photos
2 from the field · click to enlarge
Customer
Silverbrook Condominium Association
Owen Okafor
Property Manager
7242 Lakemont Loop
Tampa, FL 34127
Tampa, FL 34127
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdJul 5, 2025
- WonJul 25, 2025
- ScheduledJul 30, 2025
- CompletedJul 31, 2025
