EV Charger Install — Level 2, 48A, Mangrove Bay Estates
Mangrove Bay Estates · Building A — Storage Wing
$8,854
EV Charger Install
Scope of work
Install Level 2 EV charging equipment with dedicated circuit. Permit and inspection included. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material6 AWG Bare Copper Ground | 194 ft | $2.92 | $566.48 |
| MaterialAutomatic Transfer Switch, 200A | 1 ea | $1,553.66 | $1,553.66 |
| Material12/3 NM-B w/ Ground — 250 ft coil | 1 coil | $253.23 | $253.23 |
| LaborElectrical labour — ev charger install | 54.9 hr | $118.05 | $6,481.09 |
| Total | $8,854.46 | ||
Customer
Mangrove Bay Estates
Roland Mercer
Maintenance Coordinator
938 Silverbrook Path
Seminole, FL 34262
Seminole, FL 34262
Timeline
- Lead createdJan 6, 2026
- Bid lostJan 27, 2026
Lost: Price — went with a lower bid