JOB-1900Paid

Panel Upgrade — 100A Service + Surge Protection, Sandpiper Residences

Sandpiper Residences · Warehouse

$4,990
Panel Upgrade

Scope of work

Remove obsolete panel and install new load center. All work per NEC and local amendments.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material14/2 NM-B w/ Ground — 250 ft coil3 coil$128.13$384.39
MaterialType 2 Whole-Home Surge Protective Device6 ea$260.71$1,564.26
Material20A Single-Pole Breaker1 ea$16.25$16.25
PermitPermit and inspection fees1 ea$185.50$185.50
LaborElectrical labour — panel upgrade24.1 hr$117.83$2,839.82
Total$4,990.22

Job photos

3 from the field · click to enlarge

Activity

Notes on this job

  • EV
    Emmett VanceJan 29

    Walked the site with the customer. Scope confirmed, no surprises.

  • EV
    Emmett VanceJan 8

    Found existing wiring in worse shape than quoted. Flagged to customer.

  • EV
    Emmett VanceDec 31

    Materials staged at the shop, ready for Monday.

Customer

Open
Sandpiper Residences
Marisol Jessup
Property Manager
9485 Brightwater Ave
Oldsmar, FL 34554
Assigned crew
Crew 3 — Residential

Timeline

  1. Lead created
    Dec 30, 2024
  2. Won
    Jan 26, 2025
  3. Scheduled
    Feb 4, 2025
  4. Completed
    Feb 12, 2025