Generator Transfer Switch — Eastgate Property Group
Eastgate Property Group · Building D — Unit Block
$19,621
Generator Install
Scope of work
Install standby generator with automatic transfer switch. Permit and inspection included.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| MaterialCommercial Dual-Port EV Pedestal | 1 ea | $4,994.60 | $4,994.60 |
| Material100A Main Breaker Load Center, 24-space | 7 ea | $308.66 | $2,160.62 |
| Material200A Main Breaker Load Center, 40-space | 1 ea | $609.04 | $609.04 |
| PermitPermit and inspection fees | 1 ea | $114.02 | $114.02 |
| LaborElectrical labour — generator install | 91.3 hr | $118.01 | $10,774.32 |
| Total | $19,621.36 | ||
Job photos
2 from the field · click to enlarge
Customer
Eastgate Property Group
Nadia Winthrop
Regional Manager
2624 Harborlight Way
Palm Harbor, FL 34224
Palm Harbor, FL 34224
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdJul 9, 2025
- WonAug 6, 2025
- ScheduledAug 12, 2025
- CompletedAug 15, 2025