JOB-1906Paid

Generator Transfer Switch — Eastgate Property Group

Eastgate Property Group · Building D — Unit Block

$19,621
Generator Install

Scope of work

Install standby generator with automatic transfer switch. Permit and inspection included.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material8 AWG THHN Copper — 500 ft spool2 spool$484.38$968.76
MaterialCommercial Dual-Port EV Pedestal1 ea$4,994.60$4,994.60
Material100A Main Breaker Load Center, 24-space7 ea$308.66$2,160.62
Material200A Main Breaker Load Center, 40-space1 ea$609.04$609.04
PermitPermit and inspection fees1 ea$114.02$114.02
LaborElectrical labour — generator install91.3 hr$118.01$10,774.32
Total$19,621.36

Job photos

2 from the field · click to enlarge

Customer

Open
Eastgate Property Group
Nadia Winthrop
Regional Manager
2624 Harborlight Way
Palm Harbor, FL 34224
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Jul 9, 2025
  2. Won
    Aug 6, 2025
  3. Scheduled
    Aug 12, 2025
  4. Completed
    Aug 15, 2025