Command Palette
Search for a command to run...
Board
Open
JOB-1934Lost
Panel Replacement — Federal-Style Panel Swap, Eastgate Property Group
Eastgate Property Group · Building B — Main Building
$5,396
Panel Upgrade
Scope of work
Upgrade electrical service, including meter main and grounding. Permit and inspection included. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Double-Pole Breaker | 8 ea | $36.97 | $295.76 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 2 spool | $200.81 | $401.62 |
| MaterialType 2 Whole-Home Surge Protective Device | 4 ea | $260.71 | $1,042.84 |
| PermitPermit and inspection fees | 1 ea | $335.92 | $335.92 |
| LaborElectrical labour — panel upgrade | 28.1 hr | $118.16 | $3,320.20 |
| Total | $5,396.34 | ||
Customer
Eastgate Property Group
Nadia Winthrop
Regional Manager
3580 Ironwood Commerce Dr
Safety Harbor, FL 33842
Safety Harbor, FL 33842
Timeline
- Lead createdDec 9, 2025
- Bid lostDec 26, 2025
Lost: Price — went with a lower bid
