JOB-2021Won
EV Charging Expansion Phase 1 — Copperfield Condominium Association
Copperfield Condominium Association · Building B — Loading Dock
$6,460
EV Charger Install
Scope of work
Install Level 2 EV charging equipment with dedicated circuit. Existing materials removed and disposed of. All work per NEC and local amendments.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, Black — 500 ft spool | 3 spool | $200.81 | $602.43 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 3 coil | $128.13 | $384.39 |
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| LaborElectrical labour — ev charger install | 38.2 hr | $117.92 | $4,504.39 |
| Total | $6,459.97 | ||
Activity
Notes on this job
- EVEmmett Vance2w ago
Inspection passed first time.
Customer
Copperfield Condominium Association
Rosalind Thackeray
Property Manager
7164 Lakemont Loop
Temple Terrace, FL 33702
Temple Terrace, FL 33702
Assigned crew
Crew 4 — Power & Standby
Timeline
- Lead createdJul 14, 2026
- WonJul 31, 2026