Board
JOB-2021Won

EV Charging Expansion Phase 1 — Copperfield Condominium Association

Copperfield Condominium Association · Building B — Loading Dock

$6,460
EV Charger Install

Scope of work

Install Level 2 EV charging equipment with dedicated circuit. Existing materials removed and disposed of. All work per NEC and local amendments.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material12 AWG THHN Copper, Black — 500 ft spool3 spool$200.81$602.43
Material14/2 NM-B w/ Ground — 250 ft coil3 coil$128.13$384.39
Material8 AWG THHN Copper — 500 ft spool2 spool$484.38$968.76
LaborElectrical labour — ev charger install38.2 hr$117.92$4,504.39
Total$6,459.97

Activity

Notes on this job

  • EV
    Emmett Vance2w ago

    Inspection passed first time.

Customer

Open
Copperfield Condominium Association
Rosalind Thackeray
Property Manager
7164 Lakemont Loop
Temple Terrace, FL 33702
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Jul 14, 2026
  2. Won
    Jul 31, 2026