Generator Transfer Switch — Copperfield Condominium Association

Copperfield Condominium Association · Building C — Pump House

$25,907
Generator Install

Scope of work

Set generator pad, run gas and electrical, commission unit. Final walkthrough with customer before sign-off.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material100A Main Breaker Load Center, 24-space2 ea$308.66$617.32
Material6 AWG Bare Copper Ground333 ft$2.92$972.36
MaterialAir-Cooled Standby Generator, 22 kW1 ea$6,581.52$6,581.52
Material50A Double-Pole Breaker9 ea$58.90$530.10
Material8 AWG THHN Copper — 500 ft spool1 spool$484.38$484.38
PermitPermit and inspection fees1 ea$314.15$314.15
LaborElectrical labour — generator install139 hr$118.03$16,406.80
Total$25,906.63

Job photos

3 from the field · click to enlarge

Customer

Open
Copperfield Condominium Association
Rosalind Thackeray
Property Manager
9206 Ironwood Commerce Dr
Palm Harbor, FL 34180
Assigned crew
Crew 4 — Power & Standby

Timeline

  1. Lead created
    Jul 24, 2023
  2. Won
    Aug 15, 2023
  3. Scheduled
    Sep 8, 2023
  4. Completed
    Sep 10, 2023