JOB-2074Paid
Panel Replacement — Federal-Style Panel Swap, Lakemont Condominium Association
Lakemont Condominium Association · Storage Wing
$4,632
Panel Upgrade
Scope of work
Upgrade electrical service, including meter main and grounding. All work per NEC and local amendments. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material4/0 AWG Aluminum SER Cable | 186 ft | $8.22 | $1,528.92 |
| Material10 AWG THHN Copper, Red — 500 ft spool | 1 spool | $305.45 | $305.45 |
| Material20A Double-Pole Breaker | 1 ea | $36.97 | $36.97 |
| Material20A Single-Pole Breaker | 1 ea | $16.25 | $16.25 |
| PermitPermit and inspection fees | 1 ea | $205.72 | $205.72 |
| LaborElectrical labour — panel upgrade | 21.5 hr | $118.09 | $2,538.98 |
| Total | $4,632.29 | ||
Job photos
3 from the field · click to enlarge
Customer
Lakemont Condominium Association
Colette Ashford
Maintenance Coordinator
174 Brightwater Ave
Palm Harbor, FL 34525
Palm Harbor, FL 34525
Assigned crew
Crew 3 — Residential
Timeline
- Lead createdJul 18, 2024
- WonAug 2, 2024
- ScheduledAug 20, 2024
- CompletedAug 22, 2024