Command Palette
Search for a command to run...
Board
Open
JOB-2086Lost
EV Charger Install — Level 2, 48A, Lakemont Condominium Association
Lakemont Condominium Association · Storage Wing
$9,720
EV Charger Install
Scope of work
Install Level 2 EV charging equipment with dedicated circuit. Final walkthrough with customer before sign-off. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material12 AWG THHN Copper, White — 500 ft spool | 2 spool | $200.81 | $401.62 |
| Material4/0 AWG Aluminum SER Cable | 145 ft | $8.22 | $1,191.90 |
| Material12 AWG THHN Copper, Black — 500 ft spool | 3 spool | $200.81 | $602.43 |
| Material8 AWG THHN Copper — 500 ft spool | 2 spool | $484.38 | $968.76 |
| LaborElectrical labour — ev charger install | 55.6 hr | $117.91 | $6,555.61 |
| Total | $9,720.32 | ||
Activity
Notes on this job
- EVEmmett VanceJun 8
Walked the site with the customer. Scope confirmed, no surprises.
- EVEmmett VanceMay 28
Materials staged at the shop, ready for Monday.
Customer
Lakemont Condominium Association
Colette Ashford
Maintenance Coordinator
4512 Harborlight Way
Largo, FL 34616
Largo, FL 34616
Timeline
- Lead createdMay 28, 2025
- Bid lostJun 11, 2025
Lost: Went with incumbent contractor
