Command Palette
Search for a command to run...
Board
Open
JOB-2089Estimate Sent
Panel Upgrade — 400A Service + Surge Protection, Lakemont Condominium Association
Lakemont Condominium Association · Storage Wing
$5,369
Panel Upgrade
Scope of work
Replace existing service panel and bring to current code. All work per NEC and local amendments. Existing materials removed and disposed of.
Line items
Materials, labor, and fees
| Description | Qty | Unit | Amount |
|---|---|---|---|
| Material20A Single-Pole Breaker | 10 ea | $16.25 | $162.50 |
| Material14/2 NM-B w/ Ground — 250 ft coil | 3 coil | $128.13 | $384.39 |
| Material200A Main Breaker Load Center, 40-space | 1 ea | $609.04 | $609.04 |
| Material4/0 AWG Aluminum SER Cable | 58 ft | $8.22 | $476.76 |
| PermitPermit and inspection fees | 1 ea | $257.66 | $257.66 |
| LaborElectrical labour — panel upgrade | 29.5 hr | $117.92 | $3,478.57 |
| Total | $5,368.92 | ||
Customer
Lakemont Condominium Association
Colette Ashford
Maintenance Coordinator
3268 Brightwater Ave
St. Petersburg, FL 34066
St. Petersburg, FL 34066
Timeline
- Lead createdJul 20, 2026
