JOB-2093Lost

Panel Upgrade — 100A Service, Lakemont Condominium Association

Lakemont Condominium Association · Storage Wing

$4,637
Panel Upgrade

Scope of work

Replace existing service panel and bring to current code. Existing materials removed and disposed of.

Line items

Materials, labor, and fees

DescriptionQtyUnitAmount
Material20A AFCI/GFCI Dual-Function Breaker12 ea$77.40$928.80
Material12 AWG THHN Copper, Black — 500 ft spool2 spool$200.81$401.62
Material14/2 NM-B w/ Ground — 250 ft coil1 coil$128.13$128.13
Material20A Double-Pole Breaker7 ea$36.97$258.79
PermitPermit and inspection fees1 ea$420.10$420.10
LaborElectrical labour — panel upgrade21.2 hr$117.88$2,499.15
Total$4,636.59

Customer

Open
Lakemont Condominium Association
Colette Ashford
Maintenance Coordinator
3268 Brightwater Ave
St. Petersburg, FL 34066

Timeline

  1. Lead created
    Aug 26, 2025
  2. Bid lost
    Sep 11, 2025

Lost: Went with incumbent contractor